This is a list of solar farms in Queensland. There has been significant growth in this area recently, with an estimated 17298 MW of solar capacity either operational, planned or under construction.

Map all coordinates using OpenStreetMap

Download coordinates as:

Table

Project name Sponsoring company Coordinates Capacity (MW) (AC) Status Notes
Daydream Solar Farm Edify Energy 20°29′41″S 147°44′49″E / 20.494622°S 147.746973°E / -20.494622; 147.746973 (Daydream) 150 Operating 180 MW DC capacity. Started commercial operations in August 2018. Originally developed by Solar Choice.
Sun Metals Solar Farm Sun Metals 19°26′13″S 146°41′46″E / 19.437°S 146.696°E / -19.437; 146.696 (Sun Metals) 124 Operating 124 MW AC capacity. Started exporting to the grid in May 2018.
Ross River Solar Farm Palisade 19°25′30″S 146°42′58″E / 19.425°S 146.716°E / -19.425; 146.716 (Ross River) 128 Operating Started exporting to the grid in September 2018.
Darling Downs Solar Farm APA Group 27°06′43″S 150°52′55″E / 27.112°S 150.882°E / -27.112; 150.882 (Darling Downs) 110 Operating Started exporting to the grid in September 2018.
Clare Solar Farm Fotowatio Renewable Ventures 19°50′24″S 147°12′40″E / 19.840°S 147.211°E / -19.840; 147.211 (Clare) 100 Operating Started exporting to the grid in May 2018.
Emerald Solar Park RES Group 23°30′36″S 148°08′17″E / 23.510006°S 148.137953°E / -23.510006; 148.137953 (Emerald) 68 Operating Started exporting to the grid in October 2018.
Hamilton Solar Farm Wirsol and Edify Energy 20°29′40″S 147°46′17″E / 20.494401°S 147.771521°E / -20.494401; 147.771521 (Hamilton) 57.5 Operating Started exporting to the grid in March 2018.
Hayman Solar Farm Edify Energy 20°29′41″S 147°44′55″E / 20.494683°S 147.748475°E / -20.494683; 147.748475 (Daydream) 50 Operating Started commercial operations in August 2018.
Whitsunday Solar Farm Wirsol and Edify Energy 20°30′17″S 147°46′03″E / 20.504823°S 147.767454°E / -20.504823; 147.767454 (Whitsunday) 57.5 Operating Started exporting to the grid in March 2018.
Kidston Solar Project KS1 Genex Power 18°52′48″S 144°09′04″E / 18.880°S 144.151°E / -18.880; 144.151 (Kidston 1) 50 Operating 50 MW stage started exporting to the grid in November 2017.
Kidston Solar Project KS2 Genex Power 18°53′02″S 144°07′26″E / 18.884°S 144.124°E / -18.884; 144.124 (Kidston 2) 270 Announced EPBC approval pending 11 January 2019, Referral Number 2018/8229.
Aldoga Solar Farm Acciona Australia 23°48′04″S 151°03′14″E / 23.801°S 151.054°E / -23.801; 151.054 (Aldoga) 265 Approved Construction aimed to start in early-mid-2022. EPBC approval 25 September 2018 (EPBC Referral 2018/8251)
Aramara Solar Farm 25°34′19″S 149°51′14″E / 25.572°S 149.854°E / -25.572; 149.854 (Aramara) 140 Approved
Baralaba Solar Farm Fotowatio Renewable Ventures 24°11′42″S 152°19′44″E / 24.195°S 152.329°E / -24.195; 152.329 (Baralaba) 92 Announced
Barunggam Solar Farm Ubergy 26°41′06″S 150°45′54″E / 26.685°S 150.765°E / -26.685; 150.765 (Barunggam) 140 Announced Site location in cited article believed incorrect. Coordinates provided +/- 3 km accuracy
Beelbee Solar Farm APA Group 27°08′42″S 150°49′26″E / 27.145°S 150.824°E / -27.145; 150.824 (Beelbee) 150+ Approved 150-240 MW planned.
Baking Board Solar Farm Impact Investment Group 26°43′23″S 150°33′11″E / 26.723°S 150.553°E / -26.723; 150.553 (Baking Board) 19.9 Operating
Barcaldine RC Solar Farm Elecnor 23°32′49″S 145°19′05″E / 23.547°S 145.318°E / -23.547; 145.318 (Barcaldine) 20 Operating A further 40 MW proposed
Blackwater Solar Farm Blackwater Solar Farm Pty Ltd 23°35′49″S 148°45′11″E / 23.597°S 148.753°E / -23.597; 148.753 (Blackwater) 150 Approved Approved 11 Aug 2017
Blair Athol Solar Power Station TerraCom Limited 22°41′28″S 147°32′31″E / 22.691°S 147.542°E / -22.691; 147.542 (Blair Athol) 60 Announced
Blue Grass Solar Farm X-Elio Australia Pty Ltd 26°40′48″S 150°29′35″E / 26.680°S 150.493°E / -26.680; 150.493 (Blue Grass) 102 Approved Decision Notice Nov 2018
Bluewater Solar Farm Fotowatio Renewable Ventures 19°08′42″S 146°29′06″E / 19.145°S 146.485°E / -19.145; 146.485 (Bluewater) 148 Announced EPBC approval obtained
Bluff Solar Farm Infigen Energy 23°35′53″S 149°02′20″E / 23.598°S 149.039°E / -23.598; 149.039 (Bluff) 260 Announced
Bouldercombe Solar Farm Eco Energy World 23°31′30″S 150°29′56″E / 23.525°S 150.499°E / -23.525; 150.499 (Bouldercombe) 280 Approved
Bowen Solar Farm Infigen Energy 20°04′34″S 148°12′58″E / 20.076°S 148.216°E / -20.076; 148.216 (Bowen) 100 Announced EPBC Referral reference 2017/8123 pending approvals 2 Nov 2018
Brigalow Solar Farm Impact Investment Group 27°41′24″S 151°33′50″E / 27.690°S 151.564°E / -27.690; 151.564 (Brigalow) 34.5 Approved
Broadlea Solar Farm Eco Energy World 21°51′43″S 148°10′12″E / 21.862°S 148.170°E / -21.862; 148.170 (Broadlea) 100 Approved
Bucca Solar Farm PB Enertec Pry Ltd 24°56′20″S 152°04′48″E / 24.939°S 152.080°E / -24.939; 152.080 (Bucca) 108.8 Approved Approved 21 Dec 2018 PD on Line Reference Number 522.2018.108.1
Bulli Creek Solar Farm Solar Choice 28°01′16″S 150°52′41″E / 28.021°S 150.878°E / -28.021; 150.878 (Bulli Creek) 2000 Approved Original developer Solar Choice acquired 100% ownership in June 2021
Bullyard Solar Farm EIWA Solar Bundaberg Pry Ltd 24°56′17″S 152°00′54″E / 24.938°S 152.015°E / -24.938; 152.015 (Bullyard) 92 Approved Approved 8 Nov 2018 PD on Line Reference Number 522.2018.70.1
Burdekin Solar Farm Cleangen 19°52′48″S 147°09′54″E / 19.880°S 147.165°E / -19.880; 147.165 (Burdikin) 140 Approved Approved
Cameby Solar Farm X-Elio 26°40′55″S 150°30′36″E / 26.682°S 150.510°E / -26.682; 150.510 (Cameby) 148 Approved Approved Nov 2018
Cape York Solar Storage Lyon Group 15°53′53″S 144°51′25″E / 15.898°S 144.857°E / -15.898; 144.857 (Cape York) 55 Approved Approved July 2017
Chewco Solar Energy Farm Tilt Renewables 17°02′49″S 145°23′02″E / 17.047°S 145.384°E / -17.047; 145.384 (Chewco) 75 Announced Fact Sheet August 2017
Childers Solar Farm Elliot Green Power 25°18′11″S 152°24′11″E / 25.303°S 152.403°E / -25.303; 152.403 (Childers) 56 Operating 56 MW AC, 75 MW DC. Started exporting to the grid in March 2019.
Childers DDN Green Solar Farm DDN Green 24°55′23″S 152°17′38″E / 24.923°S 152.294°E / -24.923; 152.294 (Childers DDN) 42 Announced Development application lodged 23 October 2018 PD on Line Reference Number 522.2017.88.1
Chinchilla Solar Farm First Solar 26°40′12″S 150°47′35″E / 26.670°S 150.793°E / -26.670; 150.793 (Chinchilla) 100 Approved
Clarke Creek Wind and Solar Farm Lacour Energy 22°39′22″S 149°20′49″E / 22.656°S 149.347°E / -22.656; 149.347 (Clarke Creek W&S) 400 Approved
Clermont Solar Farm Wirsol 22°50′20″S 147°34′52″E / 22.839°S 147.581°E / -22.839; 147.581 (Clermont) 75 Operating Started exporting to the grid in June 2019.
Cloncurry (Solarvoltaic) Solar Farm Infigen Energy 20°42′22″S 140°30′32″E / 20.706°S 140.509°E / -20.706; 140.509 (Cloncurry) 30 Announced
Collinsville Solar PV Ratch Australia 20°32′17″S 147°48′25″E / 20.538°S 147.807°E / -20.538; 147.807 (Collinsville) 42.5 Operating
Comet Solar Farm Hadstone Energy /Comet Solar Farm Pty Ltd 23°36′47″S 148°46′12″E / 23.613°S 148.770°E / -23.613; 148.770 (Comet) 235 Approved Due to commission on 30 November 2018.
Columboola Solar Farm Luminous Energy 26°38′10″S 150°17′46″E / 26.636°S 150.296°E / -26.636; 150.296 (Columboola) 310 Approved
Crinum Creek Solar Farm Adani 23°01′52″S 148°20′24″E / 23.031°S 148.340°E / -23.031; 148.340 (Crinum Creek) 100 Announced GMUSG-SACOME-Conference Aug 2016
Dalby Solar Farm RES RES 27°12′29″S 151°18′29″E / 27.208°S 151.308°E / -27.208; 151.308 (Dalby RES) 22 Approved
Daystar Energy Solar Farm Daystar Energy 26°38′35″S 150°17′24″E / 26.643°S 150.290°E / -26.643; 150.290 (Daystar) 100 Approved Decision Notice Oct 18
Delga Solar Farm Shell 26°16′26″S 149°44′56″E / 26.274°S 149.749°E / -26.274; 149.749 (Delga Park) 250 Approved
Desailly Renewable Energy Park DP Energy 16°29′17″S 145°23′02″E / 16.488°S 145.384°E / -16.488; 145.384 (Desailly) 250 Announced Development application lodged project website
Dingo Solar Farm ESCO Pacific 23°38′02″S 149°22′59″E / 23.634°S 149.383°E / -23.634; 149.383 (Dingo) 85 Announced
Dunblane Solar Farm YD Projects 23°32′25″S 145°16′31″E / 23.540294°S 145.275339°E / -23.540294; 145.275339 (Dunblane) 11 Operating
Dysart Solar Energy Farm Tilt Renewables 22°34′44″S 148°22′05″E / 22.579°S 148.368°E / -22.579; 148.368 (Dysart) 150 Approved Project approval
Dysart Solar Farm Hanwha 22°30′50″S 148°30′14″E / 22.514°S 148.504°E / -22.514; 148.504 (Dysart Hanwha) 130 Announced
Edenvale Solar Farm Edenvale Solar Park Pty Ltd 26°55′55″S 150°34′59″E / 26.932°S 150.583°E / -26.932; 150.583 (Edenvale) 280 Approved
Everleigh Solar Farm Everleigh Solar Park Pty Ltd 26°54′47″S 150°35′10″E / 26.913°S 150.586°E / -26.913; 150.586 (Everleigh) 150 Approved Decision Notice Project and owner name are correct
Gooburrum Solar Farm PB Enertec Pry Ltd 24°48′25″S 152°19′08″E / 24.807°S 152.319°E / -24.807; 152.319 (Gooburrum) 4 Approved Approved 15 Dec 2017 PD on Line Reference Number 522.2017.26.1
Gregory Solar Farm Engie Renewables Australia 23°08′35″S 148°26′49″E / 23.143°S 148.447°E / -23.143; 148.447 (Gregory) 215 Approved
Gumlu Solar Farm RJ Gordon Solar Consultants 19°52′16″S 147°40′05″E / 19.871°S 147.668°E / -19.871; 147.668 (Gumlu) 60 Announced
Gympie Regional Energy Hub SolarQ 26°05′38″S 152°26′35″E / 26.094°S 152.443°E / -26.094; 152.443 (Gympie) 350 Approved 350 MW approved, 1000 MW additional in planning.
Harlin Solar Farm Sunshine Energy 26°56′53″S 152°24′36″E / 26.948°S 152.410°E / -26.948; 152.410 (Harlin) 1500 Under construction Construction began in February 2019. There are plans to add a 500MWh battery storage facility.
Haughton Solar Farm Pacific Blue 19°43′52″S 147°04′23″E / 19.731°S 147.073°E / -19.731; 147.073 (Haughton) 100 Operating First 100 MW stage began exporting to the grid in June 2019. It is believed the other stages have not begun construction.
Hughenden Sun Farm Lighthouse Solar 20°51′14″S 144°11′10″E / 20.854°S 144.186°E / -20.854; 144.186 (Hughenden) 22.5 Operating Construction started in September 2017 and production commenced in September 2018.
Kelsey Creek Solar Farm KCSF Consortium 20°26′56″S 148°32′20″E / 20.449°S 148.539°E / -20.449; 148.539 (Kelsey Creek) 50 Announced
Kennedy Energy Park Windlab / Eurus 20°56′06″S 144°18′54″E / 20.935°S 144.315°E / -20.935; 144.315 (Kennedy) 15 Under construction First 15 MW stage commenced. Further 650 MW stage had not begun as of November 2018.
Kingaroy Solar Farm Terrain Energy 26°32′17″S 151°53′10″E / 26.538°S 151.886°E / -26.538; 151.886 (Kingaroy) 40 Announced Development approval refused 23 Nov 2018, appeal lodged against Council decision and pending
Koberinga Solar Farm ESCO Pacific 19°49′34″S 147°31′37″E / 19.826°S 147.527°E / -19.826; 147.527 (Koberinga) 55 Announced
Lakeland Solar Farm Conergy Australia, now rebranded as Blueleaf Energy 15°52′05″S 144°51′43″E / 15.868°S 144.862°E / -15.868; 144.862 (Lakeland) 10.8 Operating
Lilyvale Solar Farm Fotowatio Renewable Ventures 23°04′12″S 148°25′23″E / 23.070°S 148.423°E / -23.070; 148.423 (Lilyvale) 100 Operating Started exporting to the grid in March 2019.
Longreach Solar Farm Canadian Solar 23°27′00″S 144°21′42″E / 23.44993°S 144.361703°E / -23.44993; 144.361703 (Longreach) 15 Operating
Majors Creek Solar Farm Edify 19°34′55″S 146°51′43″E / 19.582°S 146.862°E / -19.582; 146.862 (Majors Creek) 200 Announced EPBC approval 20 July 2017 EPBC Reference 2017/7963 Town planning report
Mareeba Solar Farm CleanGen 16°00′00″S 145°24′00″E / 16.000°S 145.400°E / -16.000; 145.400 (Mareeba) 60 Approved
Mica Creek Solar Farm APA Group 20°48′37″S 139°29′37″E / 20.81027°S 139.49365°E / -20.81027; 139.49365 (Mica Creek Solar Farm) 88 Operating
Middlemount Solar Farm Overland 22°49′26″S 148°43′23″E / 22.824°S 148.723°E / -22.824; 148.723 (Middlemont) 28 Operating
Mirani Solar Farm ESCO Pacific 21°08′46″S 148°49′48″E / 21.146°S 148.830°E / -21.146; 148.830 (Mirani) 60 Approved
Moura Solar Farm ESCO Pacific 24°30′50″S 150°05′02″E / 24.514°S 150.084°E / -24.514; 150.084 (Moura) 110 Announced
Munna Creek Solar Farm Renewable Energy System Technologies 25°53′31″S 152°28′08″E / 25.892°S 152.469°E / -25.892; 152.469 (Munna Creek) 120 Approved
Normanton Solar Farm Scouller Energy 17°40′52″S 141°03′00″E / 17.681°S 141.050°E / -17.681; 141.050 (Normanton) 5 Operating
Oakdene Solar Farm juwi 26°42′36″S 150°43′30″E / 26.710°S 150.725°E / -26.710; 150.725 (Oakdene) 100 Announced Development approval subject to appeal Mar 2019
Oakey Solar Farm Canadian Solar Australia / RE Oakey 27°24′26″S 151°39′39″E / 27.407166°S 151.660702°E / -27.407166; 151.660702 (Oakey) 25 Operating Oakey 1 (25MW) started exporting to the grid in March 2019.

Oakey 2 (55MW) had not started exporting to the grid as of July 2019.

Paget Solar Farm BOMA Group 21°11′24″S 149°09′54″E / 21.190°S 149.165°E / -21.190; 149.165 (Paget) 20 Announced
Qunaba Solar Farm PB Enertec Pry Ltd 24°54′04″S 152°26′10″E / 24.901°S 152.436°E / -24.901; 152.436 (Qunaba) 77 Approved Approved 21 Dec 2018 PD on Line Reference Number 522.2018.113.1
Raglan Solar Farm Eco Energy World 23°45′29″S 150°51′00″E / 23.758°S 150.850°E / -23.758; 150.850 (Raglan) 350 Approved
Rodds Bay Solar Farm Renew Estate 24°11′20″S 151°35′06″E / 24.189°S 151.585°E / -24.189; 151.585 (Rodds Bay) 250 Approved
Rolleston Solar Farm RES Group 24°23′46″S 148°28′23″E / 24.396°S 148.473°E / -24.396; 148.473 (Rolleston) 90 Approved
Rollingstone Solar Farm ESCO Pacific 19°00′47″S 146°24′25″E / 19.013°S 146.407°E / -19.013; 146.407 (Rollingstone) 110 Approved
Rugby Run Solar Farm Adani Australia 22°05′02″S 147°52′12″E / 22.084°S 147.870°E / -22.084; 147.870 (Rugby Run) 65 Operating Started exporting to the grid in May 2019.
Susan River Solar Farm Elliot Green Power 25°25′01″S 152°44′38″E / 25.417°S 152.744°E / -25.417; 152.744 (Susan River) 75 Operating 75 MW AC, 95 MW DC. Started exporting to the grid in December 2018. Officially opened in February 2019.
Sunshine Coast Solar Farm Sunshine Coast Regional Council 26°33′36″S 153°01′34″E / 26.560°S 153.026°E / -26.560; 153.026 (Sunshine Coast) 15 Operating
Tieri Solar Farm Fotowatio Renewable Ventures 23°05′46″S 148°02′42″E / 23.096°S 148.045°E / -23.096; 148.045 (Tieri) 96 Approved
Wandoan Solar Project Equis 26°14′53″S 149°45′50″E / 26.248°S 149.764°E / -26.248; 149.764 (Wandoan) 1000 Approved
Warhook Solar Project Engie Renewables Australia 26°36′43″S 150°15′32″E / 26.612°S 150.259°E / -26.612; 150.259 (Warhook) 200 Approved
Warwick Solar Farm University of Queensland 28°11′20″S 152°03′36″E / 28.189°S 152.060°E / -28.189; 152.060 (Warwick) 64 Operating Construction started in April 2019.
Western Downs Green Power Hub Neoen 26°57′18″S 150°40′37″E / 26.955°S 150.677°E / -26.955; 150.677 (WDGPH) 460 Under construction Paired with 200 MW/400 MWh of battery storage.
Western Downs Solar Farm Tilt Renewables 26°56′13″S 150°42′25″E / 26.937°S 150.707°E / -26.937; 150.707 (Western Downs) 250 Announced
Woolooga Energy Park LGI Limited 26°04′34″S 152°29′13″E / 26.076°S 152.487°E / -26.076; 152.487 (Wooloolga) 185 Announced
Yarranlea Solar Farm Risen 27°42′27″S 151°31′37″E / 27.7074°S 151.527°E / -27.7074; 151.527 (Yarranlea) 100 Operating Construction started 23 July 2018

Summary of capacity

Status Capacity (MW)
Operating 1609.5
Under construction 1726.9
Approved 7904.3
Announced 2852
Total 14092.7

References

  1. "Electricity generation map". maps.dnrm.qld.gov.au. Queensland Department of Energy and Water Supply. Archived from the original on 26 November 2018. Retrieved 26 November 2018.
  2. "Daydream Solar Farm". Edify Energy. Archived from the original on 3 November 2018. Retrieved 13 November 2018.
  3. "Whitsunday Solar Farm hub helicopter flyover [Video & Photos]". 19 June 2018. Archived from the original on 25 February 2019. Retrieved 25 February 2019.
  4. "Daydream Solar Farm". Edify Energy. Archived from the original on 3 November 2018. Retrieved 26 November 2018.
  5. "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 31 May 2018. Archived from the original on 27 July 2018. Retrieved 27 July 2018.
  6. "Sun Metals Solar Farm". Archived from the original on 27 July 2018. Retrieved 26 November 2018.
  7. "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 31 May 2018. Archived from the original on 27 July 2018. Retrieved 26 November 2018.
  8. "The Project". Ross River Solar Farm. Archived from the original on 13 October 2018. Retrieved 27 September 2018.
  9. ^ "Renewables flow for Queensland". pv magazine Australia. Archived from the original on 28 July 2018. Retrieved 13 June 2018.
  10. "Hamilton Solar Farm". Edify Energy. Archived from the original on 28 November 2018. Retrieved 26 November 2018.
  11. "Hayman Solar Farm". Edify Energy. Archived from the original on 26 November 2018. Retrieved 26 November 2018.
  12. "Whitsunday Solar Farm". Edify Energy. Archived from the original on 8 December 2018. Retrieved 26 November 2018.
  13. "50 MW Kidston Solar Project". Genex Power Limited. Archived from the original on 26 November 2018. Retrieved 26 November 2018.
  14. "50 MW Kidston Solar Project". EPBC. Archived from the original on 11 January 2019. Retrieved 11 January 2019.
  15. "Aldoga Solar Farm". www.acciona.com.au. Archived from the original on 25 November 2021. Retrieved 26 November 2021.
  16. "Aramara Solar Farm". AltEnergy. Archived from the original on 27 November 2018. Retrieved 27 November 2018.
  17. "Home - FRV Baralaba Farm". FRV Baralaba Farm. Archived from the original on 27 November 2018. Retrieved 27 November 2018.
  18. "Alt energy project update" (PDF). AltEnergy. Archived (PDF) from the original on 19 January 2019. Retrieved 18 January 2019.
  19. "Beelbee Solar Farm". AltEnergy. Archived from the original on 27 November 2018. Retrieved 27 November 2018.
  20. "Barcaldine Remote Community Solar Farm" (PDF). Elecnor Australia. Archived (PDF) from the original on 8 April 2019. Retrieved 21 January 2019.
  21. "ECHDC Development Register" (PDF). CHRC. Archived (PDF) from the original on 21 January 2019. Retrieved 21 January 2019.
  22. "Blair Athol – 60 MW Solar Power Station Plans" (PDF). Archived (PDF) from the original on 26 March 2017. Retrieved 27 November 2018.
  23. "WRRC Decision Notice" (PDF). Archived (PDF) from the original on 17 January 2019. Retrieved 17 January 2019.
  24. "EPBC Approval". Archived from the original on 11 January 2019. Retrieved 10 January 2019.
  25. "Bluff Solar Farm". AltEnergy. Archived from the original on 27 November 2018. Retrieved 27 November 2018.
  26. "Bluff Solar Farm" (PDF) (Planning Report (Final)). Archived (PDF) from the original on 19 January 2019. Retrieved 16 January 2019.
  27. "Bouldercombe Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 29 November 2018.
  28. "Bowen Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 29 November 2018.
  29. "Brigalow Solar Farm". Impact. Archived from the original on 19 January 2019. Retrieved 18 January 2019.
  30. "Broadlea Solar Farm". AltEnergy. Retrieved 29 November 2018.
  31. ^ "PD On line". BRC. Retrieved 21 January 2019.
  32. "Projects". www.firstsolar.com. 15 June 2021. Archived from the original on 24 June 2021. Retrieved 16 June 2021.
  33. "Bulli Creek Solar Farm". Solar Choice. 15 June 2021. Archived from the original on 24 June 2021. Retrieved 16 June 2021.
  34. "Burdekin solar project approved". CleanGen. Archived from the original on 21 January 2019. Retrieved 21 January 2019.
  35. "WDRC Press Release". WDRC. Archived from the original on 19 January 2019. Retrieved 18 January 2019.
  36. "Cape York Solar Storage - Lyon Group". Lyon Group. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  37. "Chewko Solar Energy Farm Fact Sheet" (PDF). Static1. August 2017. Archived from the original (PDF) on 23 January 2019. Retrieved 23 January 2019.
  38. ^ "Elliott Green Power". Archived from the original on 19 April 2021. Retrieved 19 April 2021.
  39. "Solar Energy in Australia | March 2019 | Aneroid". anero.id. Archived from the original on 30 June 2019. Retrieved 30 June 2019.
  40. "Childers Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  41. "Projects". www.firstsolar.com. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  42. "Contractor and Employment Register". Clarke Creek Wind and Solar Farm. Archived from the original on 10 December 2018. Retrieved 30 November 2018.
  43. "Isaac Regional Council". IRC. Retrieved 16 January 2019.
  44. ^ "Solar Energy in Australia | June 2019 | Aneroid". anero.id. Archived from the original on 30 June 2019. Retrieved 30 June 2019.
  45. "Clermont Solar Farm". WIRSOL. 8 March 2018. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  46. "Development Pipeline". infigenenergy.com. Archived from the original on 23 January 2019. Retrieved 23 January 2019.
  47. "Collinsville North Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  48. "Comet Solar Farm". POWER PLANTS. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  49. "Hadstone's 309 MWp "Comet" Solar Farm approved in Queensland". www.linkedin.com. Archived from the original on 12 May 2024. Retrieved 30 November 2018.
  50. "Columboola Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  51. "Adani presentation" (PDF). wcci. Archived (PDF) from the original on 14 April 2020. Retrieved 23 January 2019.
  52. "RES Group". RES. Archived from the original on 23 January 2019. Retrieved 21 January 2019.
  53. "Decision Notice" (PDF). WDRC. WDRC. Archived (PDF) from the original on 17 January 2019. Retrieved 17 January 2019.
  54. "Delga Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  55. "Desailly Renewable Energy Park" (PDF). MSC. Archived (PDF) from the original on 23 March 2019. Retrieved 23 January 2019.
  56. "Desailly Solar Queensland". DP Energy. Archived from the original on 25 January 2019. Retrieved 23 January 2019.
  57. "Dingo Solar Farm". dingosolarfarm.com.au. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  58. "New 11MW solar farm sets new benchmarks in Queensland". RenewEconomy. Archived from the original on 18 January 2019. Retrieved 21 January 2019.
  59. "Dysart Solar Farm". Tilt Renewables. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  60. "Dysart Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  61. "Notice about decision - Statement of reasons" (PDF). IRC. Isaac Regional Council. 20 December 2017. Retrieved 16 January 2019.
  62. ^ "Press Release WDRC". WDRC. Retrieved 30 November 2018.
  63. "Decision Notice" (PDF). WDRC. Archived (PDF) from the original on 17 January 2019. Retrieved 17 January 2019.
  64. "Gregory Solar Farm". AltEnergy. Archived from the original on 10 January 2019. Retrieved 10 January 2019.
  65. "Gumlu solar farm proposal". North Queensland Register. Archived from the original on 23 January 2019. Retrieved 23 January 2019.
  66. "SQ1 GREH – Gympie Regional Energy Hub – Lower Wonga". SolarQ. Retrieved 30 November 2018.
  67. "1.5 GW solar, 500 MWh battery project breaks ground in Queensland". pv magazine Australia. Archived from the original on 19 July 2019. Retrieved 19 July 2019.
  68. "Sunshine Energy Projects". Sunshine Energy. Archived from the original on 19 July 2019. Retrieved 18 January 2019.
  69. "Haughton solar farm". Pacific Blue. Archived from the original on 7 June 2023. Retrieved 7 June 2023.
  70. "Haughton Solar Farm Project" (PDF). Archived (PDF) from the original on 6 March 2019. Retrieved 1 July 2019.
  71. ^ Parkinson, Giles (29 May 2019). "Two new solar farms connect to the grid in Queensland". RenewEconomy. Archived from the original on 30 June 2019. Retrieved 30 June 2019.
  72. "Hughenden Sun Farm". POWER PLANTS. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  73. "Technology". www.kcsf.com.au. Archived from the original on 22 November 2018. Retrieved 30 November 2018.
  74. "Kennedy Energy Park". kennedyenergypark.com.au. Archived from the original on 12 May 2024. Retrieved 30 November 2018.
  75. "Northern Star". northernstar.com.au. Archived from the original on 19 January 2019. Retrieved 18 January 2019.
  76. "Koberinga Solar Farm". koberingasolarfarm.com.au. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  77. "Lakeland Solar Farm". POWER PLANTS. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  78. Parkinson, Giles (12 March 2019). "Lilyvale is latest large scale solar farm to begin production in Queensland". RenewEconomy. Archived from the original on 30 June 2019. Retrieved 30 June 2019.
  79. "Home - Lilyvale Solar Farm". Lilyvale Solar Farm. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  80. "longreach solar farm". longreach solar farm. Archived from the original on 21 January 2019. Retrieved 21 January 2019.
  81. "EPBC Referral List". epbc. Archived from the original on 24 January 2019. Retrieved 23 January 2019.
  82. "TCC DA" (PDF). TCC. Archived (PDF) from the original on 24 January 2019. Retrieved 23 January 2019.
  83. "Mareeba Secures permit". cleangen.com.au. Archived from the original on 24 January 2019. Retrieved 21 January 2019.
  84. "Mica Creek Solar Farm". apa.com.au. Archived from the original on 28 June 2023. Retrieved 28 June 2023.
  85. "Middlemont Sun Farm". overlandsunfarming.com.au. Archived from the original on 24 January 2019. Retrieved 21 January 2019.
  86. "MMiddlemount solar farm". gem.wiki. Archived from the original on 28 June 2023. Retrieved 28 June 2023.
  87. "Mirani Solar Farm". miranisolarfarm.com.au. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  88. "Moura Solar Farm". mourasolarfarm.com.au. Archived from the original on 24 January 2019. Retrieved 21 January 2019.
  89. "Munna Creek Solar Farm". POWER PLANTS. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  90. "Normanton Solar Farm". normantonsolarfarm. Archived from the original on 24 January 2019. Retrieved 21 January 2019.
  91. "Council Meeting Minutes". WDRC. Retrieved 26 March 2019.
  92. Parkinson, Giles (15 March 2019). "Oakey solar farm begins production, second new plant in a week in Queensland". RenewEconomy. Archived from the original on 12 May 2024. Retrieved 30 June 2019.
  93. "OAKEY". oakeysolarfarm.com.au. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  94. "Daily Mercury". dailymercury.com.au. Archived from the original on 24 January 2019. Retrieved 23 January 2019.
  95. "Raglan Solar Farm". AltEnergy. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  96. "Rodds Bay Solar Farm". WIRSOL. 8 March 2018. Archived from the original on 19 July 2019. Retrieved 19 July 2019.
  97. "Rodds Bay Solar Farm". www.roddsbaysolarfarm.com. Archived from the original on 23 January 2019. Retrieved 21 January 2019.
  98. "Project Summary". Rolleston Solar Farm. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  99. "Rollingstone Solar Farm". rollingstonesolarfarm.com.au. Retrieved 30 November 2018.
  100. "Adani Australia". www.adaniaustralia.com. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  101. "Solar Energy in Australia | December 2018 | Aneroid". anero.id. Archived from the original on 30 June 2019. Retrieved 30 June 2019.
  102. Parkinson, Giles (5 February 2019). "Elliott Green Power opens Susan River solar farm, two more being built". RenewEconomy. Retrieved 30 June 2019.
  103. "Susan River Solar Farm". POWER PLANTS. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  104. "Solar Farm overview". scrc. Archived from the original on 3 June 2023. Retrieved 23 January 2019.
  105. "Tieri Solar Farm". reneweconomy.com.au. Archived from the original on 23 January 2019. Retrieved 23 January 2019.
  106. "Wandoan Solar Project". WDRC decision notice. Retrieved 10 January 2019.
  107. "Warhook Solar Project" (PDF). WDRC decision notice. Archived (PDF) from the original on 10 January 2019. Retrieved 10 January 2019.
  108. "Warhook Solar Farm". ENGIE Australia and New Zealand. Retrieved 19 July 2019.
  109. Vorrath, Sophie (18 April 2019). "Work begins on Warwick solar farm – UQ's ticket to 100% renewables". RenewEconomy. Archived from the original on 1 July 2019. Retrieved 1 July 2019.
  110. "Warwick Solar Farm". UQ. Retrieved 18 January 2019.
  111. "Warwick Solar Farm". terrainsolar. Archived from the original on 24 August 2021. Retrieved 24 August 2021.
  112. webk. "Western Downs Green Power hub". Archived from the original on 20 April 2019. Retrieved 19 July 2019.
  113. "Western Downs Green Power Hub". AltEnergy. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  114. "Western Downs Green Power hub". westerndownsgreenpowerhub.com.au. Archived from the original on 20 April 2019. Retrieved 30 November 2018.
  115. "Western Downs Solar Farm". Tilt Renewables. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  116. "Home". Woolooga Energy Park. Archived from the original on 30 November 2018. Retrieved 30 November 2018.
  117. "Home". Yarranlea. Archived from the original on 20 January 2019. Retrieved 18 January 2019.