Project name
|
Sponsoring company
|
Coordinates
|
Capacity (MW)
|
Status
|
Notes
|
Canunda Wind Farm
|
Engie/Mitsui
|
37°41′49″S 140°22′44″E / 37.697°S 140.379°E / -37.697; 140.379 (Canunda)
|
46
|
Operating
|
|
Cathedral Rocks Wind Farm
|
EnergyAustralia/Acciona
|
34°46′S 135°32′E / 34.76°S 135.54°E / -34.76; 135.54 (Cathedral Rocks)
|
66
|
Operating
|
|
Clements Gap Wind Farm
|
Pacific Hydro
|
33°30′00″S 138°06′00″E / 33.500°S 138.100°E / -33.500; 138.100 (Clements Gap)
|
56.7
|
Operating
|
Opened February 2010
|
Goyder Renewables Zone |
Neoen
|
33°42′S 139°00′E / 33.7°S 139.0°E / -33.7; 139.0 (Goyder Renewable Zone (proposed))
|
412.5
|
Under construction
|
Goyder South development application released August 2020 Goyder South application approved in May 2021. Early works began in December 2021 Stage 1 (412.5 MW)
|
Hallett Wind Farm
|
AGL Energy
|
33°23′42″S 138°50′24″E / 33.395°S 138.840°E / -33.395; 138.840 (Brown Hill)
|
350.7
|
Operating
|
Hallett 1 (94.5 MW), Hallett 2 (71.4 MW), Hallett 4 (132.3 MW), Hallett 5 (52.5 MW). Hallett 3 (95 MW) was cancelled.
|
Hornsdale Wind Farm
|
Neoen and Megawatt Capital
|
33°03′29″S 138°32′38″E / 33.058°S 138.544°E / -33.058; 138.544 (Hornsdale)
|
316.8
|
Operating
|
Stage 1 (102.4 MW), 2 (102.4 MW) and 3 (112 MW).
|
Lake Bonney Wind Farm
|
Infigen
|
37°46′S 140°24′E / 37.76°S 140.4°E / -37.76; 140.4 (Lake Bonney)
|
278.5
|
Operating
|
Stage 1 (80.5 MW), 2 (159 MW) and 3 (39 MW).
|
Lincoln Gap Wind Farm
|
Nexif Energy
|
32°37′08″S 137°34′48″E / 32.619°S 137.580°E / -32.619; 137.580 (Lincoln Gap)
|
212.4
|
Operating
|
59 3.6MW turbines. Stage 1 (35 turbines - 126 MW) Completed.
Stage 2 (24 turbines - 86.4 MW) completed in 2022.
|
Mount Millar Wind Farm (Yabmana)
|
Meridian Energy
|
33°42′S 136°44′E / 33.70°S 136.74°E / -33.70; 136.74 (Mount Millar)
|
70
|
Operating
|
|
Port Augusta Renewable Energy Park
|
Iberdrola
|
32°34′01″S 137°51′22″E / 32.56694°S 137.85611°E / -32.56694; 137.85611 (Port Augusta Renewable Energy Park (U/C))
|
210
|
Operating
|
Hybrid facility, 210 MW wind, 107 MW solar
|
Snowtown Wind Farm
|
Tilt Renewables
|
33°41′S 138°08′E / 33.69°S 138.13°E / -33.69; 138.13 (Snowtown)
|
368.7
|
Operating
|
Stage I & II
|
Starfish Hill Wind Farm
|
RATCH-Australia
|
35°35′02″S 138°08′13″E / 35.584°S 138.137°E / -35.584; 138.137 (Starfish Hill)
|
33
|
Operating
|
|
Waterloo Wind Farm
|
EnergyAustralia
|
34°00′00″S 138°54′00″E / 34.000°S 138.900°E / -34.000; 138.900 (Waterloo)
|
130.8
|
Operating
|
Originally built as 111 MW (2010), upgraded to 130.8 MW (2016).
|
Wattle Point Wind Farm
|
Infrastructure Capital
|
35°05′42″S 137°43′44″E / 35.095°S 137.729°E / -35.095; 137.729 (Wattle Point)
|
90.75
|
Operating
|
|
Willogoleche Wind Farm
|
Engie
|
33°23′35″S 138°50′53″E / 33.393°S 138.848°E / -33.393; 138.848 (Willogoleche)
|
119
|
Operating
|
Operating as of 2019.
|
Keyneton
|
Pacific Hydro
|
34°34′S 139°13′E / 34.57°S 139.22°E / -34.57; 139.22 (Keyneton (cancelled))
|
105
|
Cancelled
|
Development was required to have commenced by 29 November 2019 and completed by 29 November 2021. Expected to produce 325GWh/year.Pacific Hydro cancelled the project in October 2019 when it could not receive a time extension.
|
Elliston Stages 1, 2 and 3 (Tungketta Hill)
|
Ausker Energies & ANZ Infra Services
|
33°39′00″S 134°53′24″E / 33.650°S 134.890°E / -33.650; 134.890 (Elliston/Tungketta Hill (proposed))
|
200
|
Planning approval lapsed, new proposal in progress
|
|
Green Point
|
Wind Prospect
|
38°00′S 140°50′E / 38.00°S 140.84°E / -38.00; 140.84 (Green Point (cancelled))
|
44
|
Cancelled
|
Cancelled 2013
|
Carmody's Hill
|
Pacific Hydro
|
33°22′S 138°29′E / 33.37°S 138.48°E / -33.37; 138.48 (Carmody's Hill (cancelled))
|
175
|
Possibly cancelled
|
Planning approval lapsed in 2013
|
Myponga Wind Farm
|
TrustPower
|
35°24′00″S 138°27′18″E / 35.400°S 138.455°E / -35.400; 138.455 (Myponga (cancelled))
|
35
|
Cancelled
|
|
Vincent North (Sheaoak Flat)
|
Pacific Hydro
|
34°42′S 137°48′E / 34.7°S 137.8°E / -34.7; 137.8 (Vincent North (cancelled))
|
59
|
Cancelled
|
Planning approved in 2004 extended for two more years in 2008 Planning approval lapsed 2010
|
Troubridge Point (also known as Wattle Point stage 2)
|
Origin Energy
|
35°10′S 137°40′E / 35.16°S 137.67°E / -35.16; 137.67 (Troubridge Point (cancelled))
|
30
|
Cancelled
|
Wind Prospect sold to Origin Energy in 2004, seems to have lapsed by 2008.
|
Ceres
|
Spark Renewables
|
34°35′S 137°46′E / 34.58°S 137.77°E / -34.58; 137.77 (Ceres (proposed))
|
600
|
Proposed
|
Acquired in May 2022
|
Kemmiss Hill
|
Origin Energy
|
35°35′S 138°10′E / 35.58°S 138.16°E / -35.58; 138.16 (Kemmiss Hill (cancelled))
|
30
|
Cancelled
|
Refused planning consent
|
Waitpinga
|
Waitpinga Wind Farm Pty. Ltd.
|
35°35′42″S 138°30′18″E / 35.595°S 138.505°E / -35.595; 138.505 (Waitpinga (cancelled))
|
50
|
Cancelled
|
Application rejected 2005
|
Woakwine
|
Beacon Energy
|
37°22′30″S 140°01′48″E / 37.375°S 140.030°E / -37.375; 140.030 (Woakwine)
|
400
|
Possibly cancelled
|
|
Barn Hill (Red Hill)
|
RATCH-Australia
|
33°34′30″S 138°03′36″E / 33.575°S 138.060°E / -33.575; 138.060 (Barn Hill)
|
120
|
Possibly cancelled
|
Not present on website as of September 2021.
|
Kongorong
|
RATCH-Australia
|
37°54′00″S 140°33′54″E / 37.900°S 140.565°E / -37.900; 140.565 (Kongorong)
|
30
|
Possibly cancelled
|
Listed as another development of RATCH-Australia in October 2016, no longer appears on website as of September 2021.
|
Kulpara
|
RATCH-Australia
|
|
100
|
Possibly cancelled
|
Listed as another development of RATCH-Australia in October 2016, no longer appears on website as of September 2021.
|
Palmer
|
Tilt Renewables
|
34°49′S 139°08′E / 34.81°S 139.13°E / -34.81; 139.13 (Palmer)
|
300
|
Development approved
|
Final appeal against development approval overturned November 2019 Still progressing as of April 2021.
|
Twin Creek Wind Farm
|
RES Australia
|
34°18′S 139°03′E / 34.30°S 139.05°E / -34.30; 139.05 (Twin Creek)
|
183
|
Development approval
|
|