Liyuan 梨园 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Simplified Chinese | 梨园 | ||||||||||
Traditional Chinese | 梨園 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | 6082 Longgang Avenue (龙岗大道) Longgang District, Shenzhen, Guangdong China | ||||||||||
Coordinates | 22°32′25″N 114°04′35″E / 22.540206°N 114.076254°E / 22.540206; 114.076254 | ||||||||||
Operated by | SZMC (Shenzhen Metro Group) | ||||||||||
Line(s) | Line 3 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 28 December 2024 (14 days ago) (2024-12-28) | ||||||||||
Services | |||||||||||
| |||||||||||
Liyuan station (simplified Chinese: 梨园; traditional Chinese: 梨園; pinyin: Líyuán Zhàn; Jyutping: Lei4 Jyun4 Zaam6) is a station on Line 3 of Shenzhen Metro. It opened on December 28, 2024, and is located in Longgang District. The station is an elevated station, and is also the final elevated station to be built on the whole of Shenzhen Metro.
The station is part of the fourth phase of Line 3 (East Extension).
References
- "定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 2024-12-27. Retrieved 2025-01-11.
- "深圳地铁3号线东延线近期开建,延至低碳城和坪地" [Shenzhen Metro Line 3 East Extension Line will be built soon, extending to Low Carbon City and Pingdi]. Shenzhen Business Daily (in Simplified Chinese). 2020-07-28. Archived from the original on 2020-10-08. Retrieved 2025-01-11.
- "深圳地铁集团党委书记、董事长辛杰参加《民心桥》节目听众问题的落实情况" [The implementation of the audience's questions raised by Xin Jie, Party Secretary and Chairman of Shenzhen Metro Group, on the "Bridge of People's Hearts" program]. Shenzhen Government Online (in Simplified Chinese). 2020-09-08. Archived from the original on 2020-10-09. Retrieved 2025-01-11.
- "深圳地铁3号线东延"可研"获批!开工在即!建设工期为5年" [Shenzhen Metro Line 3 East Extension "Feasibility Study" approved! Construction is about to start! The construction period is 5 years]. Shenzhen News Network (in Simplified Chinese). 2020-07-24. Archived from the original on 2020-10-09. Retrieved 2025-01-11.
External links
Longgang District | |
---|---|
Areas | |
Schools | |
Colleges and universities | |
Landmarks | |
China Railway stations | |
Shenzhen Metro stations |
|
Culture | |
This list is incomplete. |