Üch-Korgon Hydro Power Plant | |
---|---|
Official name | Учкурганская ГЭC |
Country | |
Location | Shamaldy-Say |
Coordinates | 41°11′16″N 72°09′38″E / 41.18778°N 72.16056°E / 41.18778; 72.16056 |
Status | Operational |
Commission date | 1962 |
Thermal power station | |
Primary fuel | Hydropower |
Power generation | |
Units operational | 4 |
Nameplate capacity | 180 MW |
[edit on Wikidata] |
The Üch-Korgon Hydro Power Plant (Kyrgyz: Үч-Коргон ГЭСи, Russian: Уч-Курганская ГЭС) is an active hydroelectric plant on the river Naryn in Shamaldy-Say, Kyrgyzstan, upstream from Uchqoʻrgʻon in Uzbekistan. Completed in 1962, it is the oldest of the three hydroelectric plants on the river Naryn near Tash-Kömür, 25 km downstream from the Shamaldy-Say Hydroelectric Power Station. It has 4 individual turbines with a nominal output of around 45 MW and a total nominal capacity of 180 MW. The power plant's dam is 34 m (112 ft) tall and it creates a 53,000,000 m (42,968 acre⋅ft) reservoir of which20,000,000 m (16,214 acre⋅ft) is active (or useful) for power generation.
References
- ^ "Tash-Kömür cascade of HPP" (in Russian). Energo-ES. Retrieved 14 January 2022.
- "List of major hydroelectric facilities of the Kyrgyz Republic" (PDF) (in Russian). CA Water. Retrieved 24 February 2012.
Hydroelectric dams on the river Naryn | |
---|---|
This article about a hydroelectric power plant is a stub. You can help Misplaced Pages by expanding it. |
This article about a building or structure in Kyrgyzstan is a stub. You can help Misplaced Pages by expanding it. |