Misplaced Pages

Upper Trishuli 3A Hydropower Station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Hydropower station in Rasuwa District, Nepal Dam in Rasuwa District
Upper Trishuli 3A Hydropower Station
Upper Trishuli 3A Hydropower Station is located in NepalUpper Trishuli 3A Hydropower StationLocation of Upper Trishuli 3A Hydropower Station in Nepal
Official nameUpper Trishuli 3A Hydropower Project
CountryNepal
LocationRasuwa District
Coordinates28°1′21″N 85°12′38″E / 28.02250°N 85.21056°E / 28.02250; 85.21056
PurposePower
StatusOperational
Owner(s)Mai Valley Hydropower P Ltd.
Dam and spillways
Type of damGravity
ImpoundsTrisuli River
Commission date2076-05-13 BS
TypeRun-of-the-river
Installed capacity60 MW

Upper Trishuli 3A Hydropower Station (Nepali: माथिल्लो त्रिशुली ३a जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Rasuwa District of Nepal. The flow from Trisuli River is used to generate 60 MW electricity.

The plant is owned and developed by Nepal Electricity Authority (NEA). The plant started generating electricity from 2076-05-13 BS. The generation licence will expire in 2102-11-14 BS. The power station is connected to the national grid.

Finance

The total project cost was US$125.775 million. The project was funded Government of Nepal through NEA and the loan provided by China Exim Bank.

See also

References

  1. "Operating Projects- Hydro (Above 1MW)".
  2. Annual Report 2019/2020. Nepal Electricity Authority.
  3. "Nepali prime minister inaugurates China funded hydro project in Nepal - Xinhua -English.news.cn". Archived from the original on November 19, 2019. Retrieved 2020-11-20.
Map all coordinates using OpenStreetMap

Download coordinates as:


Stub icon

This article about a hydroelectric power plant is a stub. You can help Misplaced Pages by expanding it.

Categories: