Zhongchun Road 中春路 | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Exit 9A of the station | |||||||||||||||||||||
General information | |||||||||||||||||||||
Location | Husong Highway (沪松公路) and Zhongchun Road Qibao, Minhang District, Shanghai China | ||||||||||||||||||||
Coordinates | 31°09′01″N 121°19′52″E / 31.1503°N 121.331°E / 31.1503; 121.331 | ||||||||||||||||||||
Operated by |
| ||||||||||||||||||||
Line(s) | |||||||||||||||||||||
Platforms | 5 (1 island and 3 side platforms) | ||||||||||||||||||||
Tracks | 5 | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened |
| ||||||||||||||||||||
Services | |||||||||||||||||||||
| |||||||||||||||||||||
|
Zhongchun Road (Chinese: 中春路; pinyin: Zhōngchūn Lù) is a station on Line 9 of the Shanghai Metro, and on the Airport Link Line of the Shanghai Suburban Railway. The station is located at the intersection of Husong Highway and Zhongchun Road in Qibao, Minhang District. It was first opened on December 29, 2007, as part of Line 9. The station became an interchange station when the first phase of the Airport Link Line opened on December 27, 2024.
History
Zhongchun Road was originally not part of the original Line 9 design, with only two tracks leading out of Jiuting Depot planned to the west of the current station. In March 2004, the Ministry of Railways (MOR) revised the layout for railway stations built in Shanghai, with a high-speed rail station planned in Qibao. The government of Shanghai subsequently planned to route Lines 2 and 10 to the newly proposed station, and in November Shentong Metro Group decided to insert an additional station to serve the proposed railway station. One of the tracks to Jiuting Depot, which had already started construction, was expanded to become the new station, with revisions completed by March 2005 and construction drawing design starting in May. However, the MOR decided that the high-speed rail station would be moved to Hongqiao (to become the present day Shanghai Hongqiao railway station). Shentong Metro ultimately decided to keep the newly-added Zhongchun Road station, while rerouting Line 2 and Line 10 to the new station in Hongqiao. Zhongchun Road station opened on December 29, 2007, as part of Phase 1 of Line 9.
From June until December 2024, to prepare for the opening of the Airport Link Line section of the station, several exits of the Line 9 segment of the station were closed to facilitate the construction of a walkway between the two lines. The Airport Link Line section started operations on December 27, 2024.
Station Layout
The Line 9 station was constructed as a large hub station in anticipation of the originally proposed high-speed rail station, with a returning track originally planned at neighbouring Qibao station moved here. The station also includes transfer walkways to Line 2 and Line 10, which are not currently in use.
2 | Airport Link Line Concourse | |
G | Entrances and Exits | Exits 1-6, 8 & 9 |
Side platform, doors open on the right | ||
← Airport Link Line towards Hongqiao Airport Terminal 2 | ||
→ Airport Link Line towards Pudong Airport Terminal 1&2 (Jinghong Road) → | ||
Side platform, doors open on the right | ||
B1 | Line 9 Concourse | |
B2 | Side platform, doors open on the right | |
← Line 9 towards Songjiang South Railway Station (Jiuting) | ||
Not in service | ||
Island platform, doors open on the left | ||
→ Line 9 towards Caolu (Qibao) → |
Shanghai Suburban Railway | |
---|---|
Part of Public transport in Shanghai | |
Airport Link Line | |
Stations in italics have yet to open. |
This Shanghai Metro-related article is a stub. You can help Misplaced Pages by expanding it. |
- Shanghai Shentong Metro Group; The Third Railway Survey and Design Institute Group Co., Ltd. (2012). 上海市轨道交通9号线一期(松江新城站—宜山路站)工程设计 [Shanghai Metro Line 9 Phase 1 (Songjiang New Town-Yishan Road stations) Engineering Design]. Shanghai Scientific & Technical Publishers. ISBN 978-7-5478-1161-0.
- ^ "沪轨交6、8、9号线29日通车 "一环七射八换乘"格局确立". sh.eastday.com (in Chinese (China)). December 27, 2007. Archived from the original on May 30, 2020.
- "对接机场联络线,这个轨交站点出入口临时变动!". The Paper (in Chinese (China)). June 26, 2024.
- Zheng, Zheng (December 28, 2024). "Shanghai airport rail link cuts transit time to 40 mins". China Daily.