Misplaced Pages

Bages Tram-train

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Proposed railway in Bages, Spain
This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.
Find sources: "Bages Tram-train" – news · newspapers · books · scholar · JSTOR (March 2016)

The Bages Tram-train is a railway project for the Catalan comarca of Bages. A feasibility study was conducted and ready by 2016, two years after construction began in 2014. The cost of the project, excluding the rolling stock, was €105 million.

Features

This line will be 34.4 km long, 25 km of which are Ferrocarrils de la Generalitat de Catalunya freight lines. With 25 stations, it will link the towns of Manresa, Sallent and Súria, as well as allow connection with other transportation services such as Rodalies Barcelona in Manresa.

See also

References

  1. "(untitled)". El Periódico. Archived from the original on October 28, 2007.

External links

Llobregat–Anoia Line
Stations
Main route
Igualada branch
Manresa branch
Rolling stock
Passenger trainsets
Freight locomotives
History
Former companies
Former rolling stock
DepotsMartorell Enllaç
Related articles
Railway lines in Catalonia
High-speed
Mainline
Local
Mountain
Heritage
Proposed
Defunct
Stub icon

This Spanish railway-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: