Cancelled nuclear power plant in Ohio, USA
The Erie Nuclear Power Plant was a proposed nuclear power plant to be located 9 miles (14 km) southeast of Sandusky, Ohio. It was proposed in 1976 by Ohio Edison (a forerunner of FirstEnergy) for the Central Area Power Coordination (CAPCO). The plant was to consist of two Babcock & Wilcox 1,267 megawatt reactors. Unit 1 was scheduled to be complete in 1986, Unit 2 in 1988. Preliminary work was canceled in 1980 due to new federal requirements placed on nuclear plants that make their construction more expensive and by a drop in anticipated customer energy demand.
See also
- List of books about nuclear issues
- Nuclear power debate
- Nuclear power in the United States
- List of canceled nuclear plants in the United States
References
- "Erie Power Plant Opposed". Ludington Daily News. Associated Press. October 27, 1977. Retrieved December 1, 2014.
- Hosterman, John W; Witlow, Sallie I (1983). "Clay Mineralogy of Devonian Shales in the Appalachian Basin". U.S. Geological Survey professional paper (196–198). United States Printing Office: 33. Retrieved December 1, 2014.
{{cite journal}}
: Cite journal requires|journal=
(help) - Nuclear Power Generation and Fuel Cycle Report 1997 Archived October 9, 2009, at the Wayback Machine p. 63.
- ^ Michael Woods (January 22, 1980). "Future Of 4 Proposed Ohio A-Plants In Doubt". Toledo Blade. Retrieved December 1, 2014.
- "Two Pennsylvania Utilities Get OK To Recover Losses". Toledo Blade. Associated Press. January 8, 1983. Retrieved December 1, 2014.
External links
Nuclear power in the United States | |
---|---|
NRC Region I (Northeast) | |
NRC Region II (South) | |
NRC Region III (Midwest) | |
NRC Region IV (West) | |
Converted | |
Closed |
|
Cancelled (incomplete list, whole plants only) |
|
Future | |
41°20′47″N 82°21′35″W / 41.3463°N 082.3598°W / 41.3463; -082.3598
Categories: