The Forked River Nuclear Power Plant was a proposed nuclear power plant in Lacey Township in Ocean County, New Jersey. It was proposed as a single 1,070 MW reactor in 1969 to be built by Combustion Engineering and operated by Jersey Central Power and Light. The facility would have been located on a site between JCP&L's existing Oyster Creek Nuclear Generating Station and the Garden State Parkway. Unlike the Oyster Creek Plant, the Forked River Plant would have a cooling tower to prevent the release of hot water into Oyster Creek and Barnegat Bay.
Construction of the plant was halted in 1974 due to financial cut-backs and environmental protests, but was resumed in 1976. The plant's construction was ultimately canceled in 1980, when General Public Utilities (the parent company of JCP&L) halted construction "because of financial difficulties stemming from the accident at its Three Mile Island facility", as well as uncertainty over whether the NRC would grant a license or possibly institute other costly regulations. In addition, community fears and a construction accident that killed one worker helped end the plant's construction.
See also
References
- Plan for New Reactor Dropped
- ^ Nuclear Power Generation and Fuel Cycle Report 1997 Archived October 9, 2009, at the Wayback Machine p. 63.
- "Fight Against Atomic Plant is Dropped". The New York Times. December 6, 1972.
- Waggoner, Walter (December 15, 1976). "Utility Allowed to Continue Nuclear Project". The New York Times.
- Nuclear Plant is Cancelled
- "Worker Is Killed At Atomic-Plant Site". The New York Times. Associated Press. March 13, 1979.
External links
Nuclear power in the United States | |
---|---|
NRC Region I (Northeast) | |
NRC Region II (South) | |
NRC Region III (Midwest) | |
NRC Region IV (West) | |
Converted | |
Closed |
|
Cancelled (incomplete list, whole plants only) |
|
Future | |
39°48′47″N 74°13′05″W / 39.813°N 74.218°W / 39.813; -74.218
Categories: