This article lists all the previous and planned launches by Indian Space Research Organisation (ISRO) using LVM3 rockets. As of December 2024, there have been seven launches of LVM3, with all of them being successful.
Notable missions
Flight X
Main article: Crew Module Atmospheric Re-entry ExperimentThe maiden flight of the LVM3 lifted off from the Second Launch Pad at the Satish Dhawan Space Center on 18 December 2014 at 04:00 UTC. The test had functional boosters, a core stage but carried dummy upper stage whose LOX and LH₂ tanks were filled with LN₂ and GN₂ respectively for simulating weight. It also carried the Crew Module Atmospheric Re-entry Experiment (CARE) that was tested on re-entry.
Just over five minutes into the flight, the rocket ejected CARE at an altitude of 126 kilometres (78 mi), which then descended, controlled by its onboard reaction control system. During the test, CARE's heat shield experienced a peak temperature of around 1,000 °C (1,830 °F). ISRO downlinked launch telemetry during the ballistic coasting phase until the radio black-out to avoid data loss in the event of a failure. At an altitude of around 15 kilometres (9.3 mi), the module's apex cover separated and the parachutes were deployed. CARE splashed down in the Bay of Bengal near the Andaman and Nicobar Islands and was recovered successfully.
Chandrayaan
Main articles: Chandrayaan 2 and Chandrayaan 3Following the failure of Phobos-Grunt mission of Roscosmos, it resulted in a complete review of technical aspects connected with the spacecraft, which were also slotted to be used in the proposed Russian lander for Chandrayaan-2. This delayed the lander from Russia and eventually Roscosmos declared its inability to meet up with the revised time of 2015 for its launch on board an uprated GSLV rocket along with an Indian orbiter and rover. ISRO cancelled the Russian agreement and decided to go alone with its project with marginal changes.
On 22 July 2019, the LVM3 M1 (GSLV Mk.III M1) rocket lifted off with 3850 kg Chandrayaan-2 Orbiter-Lander composite and successfully injected it into a parking orbit of 169.7 x 45,475 km. This marked the first operational flight of LVM3 after two developmental flights. The apogee of the earth parking orbit is about 6,000 km more than originally envisaged and thereby eliminated one of the seven earth-bound orbit raising manoeuvres. It was attributed to a 15 percentage increase in rocket performance. On 14 July 2023, the LVM3 M4 rocket successfully injected the 3900 kg Chandrayaan-3 composite to a parking orbit of 170 x 36,500 km. On 15 November 2023, the Cryogenic Upper Stage (C25) of the LVM3 M4 (NORAD ID: 57321) made an uncontrolled re-entry into the Earth's atmosphere around 9:12 UTC. The impact point is predicted over the North Pacific Ocean and the final ground track did not pass over India.
OneWeb
Main article: Eutelsat OneWebOn 21 March 2022, OneWeb announced that it had signed a launch agreement with United States launch provider SpaceX to launch the remaining 1st generation satellites on Falcon 9 rockets, with the first launch expected no earlier than summer 2022. On 20 April 2022 OneWeb announced a similar deal with NewSpace India Limited, the commercial arm of the Indian Space Research Organisation. OneWeb satellites were deployed by LVM3 both on 22 October 2022 and 26 March 2023 using a lightly modified version of the satellite dispenser previously used on Soyuz.
The first batch of 36 OneWeb Gen-1 satellites weighing a total of 5796 kg was launched onboard LVM3 M2 rocket codenamed OneWeb India-1 Mission on 22 October 2022 and the satellites were injected to a low earth orbit of 601 km altitude and 87.4° inclination on a sequential basis. This constituted the first commercial mission and the first multi-satellite mission to low earth orbit of the rocket, marking its entry to global commercial launch service market. The separation of satellites involved a unique maneuver of the cryogenic stage to undergo several re-orientation and velocity additions covering 9 phases spanning 75 minutes. On 26 March 2023, codenamed OneWeb India-2 Mission, the second batch of 36 satellites was launched onboard LVM3 M3 and injected to an altitude of 450 km with same inclination. The launch featured a white cryogenic stage which takes into account environmental-friendly manufacturing processes, better insulation properties and the use of lightweight materials..
Statistics
LVM3 currently has accumulated a total of 7 launches, as of 19 July 2023. Of these, all 7 have been successful, giving it a cumulative success rate of 100%.
1 2 3 4 5 2014 2016 2018 2020 2022 2024- Failure
- Partial failure
- Success
- Planned
- Decade-wise summary of LVM3 launches
Decade | Successful | Partial success | Failure | Total |
---|---|---|---|---|
2010s | 4 | 0 | 0 | 4 |
2020s | 3 | 0 | 0 | 3 |
Total | 7 | 0 | 0 | 7 |
Mission history
2014–2019 | ||||
Date/Time (UTC) |
Payload | Launch Site | Regime | Status |
---|---|---|---|---|
Flight Number | Operator | Function | ||
Remarks | ||||
18 December 2014 4:00 |
CARE 3,775 kg (8,322 lb) |
Satish Dhawan - SLP | Sub-orbital | Success |
LVM3 X | ISRO | Re-entry Module | ||
Sub-orbital developmental test flight with a non-functional cryogenic stage. The CARE module separated from the launch vehicle at an intended altitude of 126 km at a speed of 5.3 km/s. The launch validated the ignition, performance and separation aspects of S200 and L110 stages. | ||||
5 June 2017 11:58 |
GSAT-19 3,136 kg (6,914 lb) |
Satish Dhawan - SLP | GTO | Success |
GSLV Mk III D1 (LVM3 D1) | INSAT | Communication | ||
First developmental test launch with an operational cryogenic engine. The satellite was successfully injected to a parking orbit of 170 x 35,975 km with 21.5° inclination. The launch featured an ogive fairing and slanted nose cones on S200 stages to improve aerodynamic performance. | ||||
14 November 2018 11:38 |
GSAT-29 3,423 kg (7,546 lb) |
Satish Dhawan - SLP | GTO | Success |
GSLV Mk III D2 (LVM3 D2) | INSAT | Communication | ||
Second developmental test flight in full operational configuration. The satellite was successfully injected to an elongated parking orbit of 190 x 35,975 km with 21.5° inclination. L110 core used upgraded High Thrust Vikas Engines (HTVE). Developmental test flights of the rocket has completed. | ||||
22 July 2019 09:13 |
Chandrayaan-2 3,850 kg (8,490 lb) |
Satish Dhawan - SLP | EPO | Success |
GSLV Mk III M1 (LVM3 M1) | ISRO | Lunar Composite | ||
First operational launch of the rocket and successfully injected a lunar Orbiter-Lander-Rover composite spacecraft to a parking orbit of 169.7 x 45,475 km. Chairman stated a 15 percentage increment in vehicle performance which eliminated one of the scheduled seven earth-bound orbit raising burns. | ||||
2022–2023 | ||||
Date/Time (UTC) |
Payload | Launch Site | Regime | Status |
Flight Number | Operator | Function | ||
Remarks | ||||
22 October 2022 18:37 |
36 x OneWeb Gen-1 5,796 kg (12,778 lb) |
Satish Dhawan - SLP | LEO | Success |
LVM3 M2 | OneWeb | Broadband Internet | ||
First commercial launch of the rocket under NSIL and its first multi-satellite mission to low earth orbit of 601 km. The cryogenic stage performed multiple reorientation and velocity addition maneuvers to sequentially dispose the satellites. The rocket made its entry to global commercial launch service market. | ||||
26 March 2023 03:30 |
36 x OneWeb Gen-1 5,805 kg (12,798 lb) |
Satish Dhawan - SLP | LEO | Success |
LVM3 M3 | OneWeb | Broadband Internet | ||
Second batch of 36 OneWeb Gen-1 satellites launched successfully to low earth orbit of 450 km with 87.4° inclination. The launch featured a white cryogenic stage (C25) which has more environmental-friendly manufacturing processes, better insulation properties and the use of lightweight materials. | ||||
14 July 2023 09:05 |
Chandrayaan-3 3,895 kg (8,587 lb) |
Satish Dhawan - SLP | EPO | Success |
LVM3 M4 | ISRO | Lunar Composite | ||
The rocket successfully injected a lunar composite spacecraft of Propulsion Module-Lander-Rover into an elliptical parking orbit of 170 x 36,500 km. On 15 November, the Cryogenic Upper Stage of the rocket made an uncontrolled re-entry around 9:12 UTC over the North Pacific Ocean. |
Future missions
Date/Time (UTC) |
Payload | Launch Site | Regime | Status |
---|---|---|---|---|
Flight Number | Operator | Function | ||
Remarks | ||||
Q1 2025 | BlueBird 6 (1 satellite) | Satish Dhawan - SLP | LEO | Scheduled |
LVM3 M5 | AST SpaceMobile | Communications | ||
Commercial launch under NSIL. Cellphone-compatible broadband constellation. The next-generation Block 2 BlueBird satellite delivers 10x the bandwidth of BlueBird Block 1 satellites, allowing continuous cellular broadband service coverage. It will feature a ~2,400 sq ft (220 m) communications array, the largest ever developed commercially. | ||||
NET 2025 | GSAT-32 (GSAT-N3) | Satish Dhawan - SLP | GTO | Planned |
INSAT | Communication | |||
NET 2025 | GSAT-22 | Satish Dhawan- SLP | GTO | Planned |
INSAT | Communication | |||
NET 2025 | GSAT-23 | Satish Dhawan- SLP | GTO | Planned |
INSAT | Communication | |||
NET 2026 | Mars Lander Mission | Satish Dhawan - SLP | Planned | |
ISRO | ||||
29 March 2028 | Venus Orbiter Mission | Satish Dhawan - SLP | Planned | |
ISRO | ||||
NET 2028 | Chandrayaan-4 Propulsion Module Chandrayaan-4 Lander Module Chandrayaan-4 Ascender Module |
Satish Dhawan - SLP | Planned | |
LVM3 SC | ISRO | |||
NET 2028 | Chandrayaan-4 Transfer Module Chandrayaan-4 Re-entry Module |
Satish Dhawan - SLP | Planned | |
LVM3 SC | ISRO | |||
NET 2028 | BAS-B1 9,186 kg (20,252 lb) |
Satish Dhawan - SLP | LEO | Scheduled |
ISRO | Space Station | |||
First module launch of Bharatiya Antariksha Station. |
Human-rated missions
Further information: Indian Human Spaceflight ProgrammeDate/Time (UTC) |
Payload | Launch Site | Regime | Status |
---|---|---|---|---|
Flight Number | Operator | Function | ||
Remarks | ||||
Orbital Test Flights | ||||
March 1, 2025 | G1 | LP2 - SDSC SHAR | LEO | Scheduled |
HLVM3 | ISRO | |||
First orbital test flight of Gaganyaan spacecraft carrying Vyommitra. | ||||
Q1 2025 | G2 | LP2 - SDSC SHAR | LEO | Planned |
HLVM3 | ISRO | |||
Second orbital test flight of Gaganyaan spacecraft. | ||||
Q3 2025 | G3 | LP2 - SDSC SHAR | LEO | Planned |
HLVM3 | ISRO | |||
Third orbital test flight of Gaganyaan spacecraft. | ||||
Crewed Flights | ||||
TBA | H1 | LP2 - SDSC SHAR | LEO | Planned |
HLVM3 | ISRO | |||
First crewed flight of Gaganyaan spacecraft, carrying one to three Indian astronauts on a short orbital test flight. Launch mass is 7,800 kg (17,200 lb) with service module, capsule's mass is 3,735 kg (8,234 lb). | ||||
TBA | H2 | LP2 - SDSC SHAR | LEO | Scheduled |
HLVM3 | ISRO | |||
Second crewed flight of Gaganyaan spacecraft, carrying one to three Indian astronauts on a short orbital test flight. Launch mass is 7,800 kg (17,200 lb) with service module, capsule's mass is 3,735 kg (8,234 lb). | ||||
Cargo Flights | ||||
TBA | G4 | LP2 - SDSC SHAR | LEO (ISS) | Scheduled |
HLVM3 | ISRO | Resupply Spacecraft | ||
ISRO’s first ISS cargo resupply mission. | ||||
TBA | G5 | LP2 - SDSC SHAR | LEO (BAS) | Scheduled |
HLVM3 | ISRO | Resupply Spacecraft | ||
ISRO’s first BAS cargo resupply mission. |
See also
References
- "India launches largest rocket and unmanned capsule". BBC. 8 December 2014. Retrieved 20 May 2018.
- "ISRO inches closer to manned mission". The Times of India. 10 January 2014. Archived from the original on 12 January 2014. Retrieved 10 January 2014.
We will be checking the crew capsule for all parameters.
- "ISRO's unmanned crew module reaches Chennai". The Hindu. Wayback Machine. 21 December 2014. Archived from the original on 11 February 2018. Retrieved 11 February 2018.
- As it happened: Isro's launch of India's heaviest rocket Times of India 18 December 2014
- Sangeetha Kandavel (18 December 2014). "GSLV Mark III takes to the skies in test flight". The Hindu.
- "Isro to test GSLV Mk-III, crew module on December 18". The Times of India. 10 December 2014. Retrieved 11 December 2014.
- "Chandrayaan-2: India to go it alone". The Hindu. 2013-01-21. ISSN 0971-751X. Retrieved 2024-04-19.
- "Chandrayaan-2". pib.gov.in. Retrieved 2024-04-19.
- "Chandrayaan-2". www.isro.gov.in. Retrieved 2024-04-19.
- Prasad, R. (2019-07-25). "Chandrayaan-2: GSLV Mark III-M1 vehicle reduces number of orbit-raising exercises, saves fuel". The Hindu. ISSN 0971-751X. Retrieved 2024-04-19.
- ^ "Chandrayaan-2: Off to the moon". The Indian Express. 2019-07-23. Retrieved 2024-04-19.
- updated, Elizabeth Howell last (2023-07-10). "Chandrayaan-3: A complete guide to India's third mission to the moon". Space.com. Retrieved 2024-04-18.
- "Technical details for satellite GSLV R/B". N2YO.com - Real Time Satellite Tracking and Predictions. Retrieved 2023-11-18.
- "Cryogenic upper stage of Chandrayaan-3's launch vehicle makes uncontrolled re-entry into the Earth's atmosphere". The Hindu. 2023-11-15. ISSN 0971-751X. Retrieved 2023-11-18.
- "Cryogenic upper stage LVM-3 that launched Chandrayaan-3 makes re-entry". The Times of India. 2023-11-17. ISSN 0971-8257. Retrieved 2023-11-18.
- "OneWeb agrees satellite programme with SpaceX". OneWeb. 21 March 2022. Retrieved 2022-03-21.
- Michael Sheetz (March 21, 2022). "On the sidelines of #SATShow, OneWeb senior advisor Ruth Pritchard-Kelly tells press that the "soonest" the first launch with SpaceX can happen "would be this summer." "But we don't know yet" a more specific timeframe" (Tweet) – via Twitter.
- "OneWeb agrees satellite launch programme with New Space India". OneWeb. 20 April 2022. Retrieved 2022-06-07.
- "Successful launch of 36 OneWeb Satellites with ISRO/NSIL marks key milestone to enable global connectivity". OneWeb. 27 March 2023. Archived from the original on 26 March 2023. Retrieved 27 March 2023.
- Graham, William (2022-10-22). "OneWeb resumes launches with first commercial GSLV Mk.III". NASASpaceFlight.com. Retrieved 2022-10-23.
- U, Tejonmayam (23 October 2022). "Isro's heaviest rocket successfully places 36 OneWeb satellites into orbits". The Times of India. Retrieved 2022-10-23.
- ^ "LVM3 M2 / OneWeb India-1 Mission". www.isro.gov.in. Retrieved 2024-04-19.
- ^ OneWeb, India-1 Mission (23 October 2022). "36-oneweb-satellites-successfully-launched-isro-nsil-sriharikota". Eutelsat OneWeb.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ "LVM3-M3 / OneWeb India-2 Mission". www.isro.gov.in. Retrieved 2024-04-19.
- ^ "ISRO's C25 cryogenic stage now sports white, ditches black; What's the science behind it?". wionews. Retrieved 27 March 2023.
- "GSLV MkIII-D2 successfully launches GSAT-29". ISRO. Archived from the original on 14 November 2018. Retrieved 14 November 2018.
- "ISRO launches LVM3-M3 OneWeb India-2 mission with 36 satellites; all you need to know". MINT. 26 March 2023. Retrieved 26 March 2023.
- "Crew module Atmospheric Re-entry Experiment (CARE)". www.isro.gov.in. Retrieved 2024-04-19.
- "LVM-3/CARE Mission". www.isro.gov.in. Retrieved 2024-04-19.
- "The Space Review: India's heavy-lift rocket and crew module milestones: which is more important?". www.thespacereview.com. Retrieved 2024-04-19.
- "GSAT-19". www.isro.gov.in. Retrieved 2024-04-19.
- "GSAT-19 – GSLV Mk.III D1 | Spaceflight101". Retrieved 2024-04-19.
- "India launches GSAT-19 from its new, heaviest rocket". The Economic Times. 2017-06-05. ISSN 0013-0389. Retrieved 2024-04-19.
- The Hindu Net Desk (2018-11-15). "All you need to know about GSLV Mk III - D2/GSAT-29 Mission". The Hindu. ISSN 0971-751X. Retrieved 2024-04-19.
- "GSLV Mk III-D2 / GSAT-29 Mission". www.isro.gov.in. Retrieved 2024-04-19.
- "Successful Qualification of High Thrust Vikas Engine - ISRO". 2019-07-09. Archived from the original on 2019-07-09. Retrieved 2024-04-20.
- "GSLV-Mk III - M1 / Chandrayaan-2 Mission". www.isro.gov.in. Retrieved 2024-04-19.
- "GSLV MkIII-M1 Successfully Launches Chandrayaan-2 spacecraft". www.isro.gov.in. Retrieved 2024-04-19.
- Kabir, Radifah (2022-10-23). "OneWeb India-1 Mission: ISRO's Heaviest Rocket Successfully Launches 36 Satellites Into Orbit". news.abplive.com. Retrieved 2024-04-19.
- India-2 Mission, OneWeb (27 March 2023). "Successful-launch-36-oneweb-satellites-isronsil-marks-key-milestone-enable-global".
{{cite web}}
: CS1 maint: numeric names: authors list (link) - "Chandrayaan-3". www.isro.gov.in. Retrieved 2024-04-19.
- Linganna, Girish (2023-11-17). "Uncharted Re-entry: Chandrayaan-3's rocket LVM3 M4's Cryogenic Stage's Uncontrolled Re-entry". Frontier India. Retrieved 2024-04-19.
- "Chandrayaan-3: India's historic Moon mission lifts off successfully". 2023-07-13. Retrieved 2024-04-19.
- "LVM3 | BlueBird Block 2". nextspaceflight.com. Retrieved 2024-11-15.
- "Integrated Launch Manifesto for 2023-24 (Q4) & 2024-25". NSIL. 2024-02-08.
- Rainbow, Jason (2024-11-15). "AST SpaceMobile leans on Blue Origin to ramp up satellite launches". SpaceNews. Retrieved 2024-11-15.
- ^ "Annual report 2020-2021" (PDF). Archived from the original (PDF) on 2021-12-29. Retrieved 2024-04-20.
- "Mangalyaan-2: ISRO working on the second mission to Mars nine years after MOM's success". Business Today. 2023-10-02. Retrieved 2024-04-19.
- "Mangalyaan-2 Mission: ISRO to deploy 4 powerful payloads". HT Tech. 2023-10-21. Retrieved 2024-04-19.
- "India once again sets sights on Mars, readies to launch Mangalyaan-2". WION. 2023-10-02. Retrieved 2024-04-19.
- "All about Sukrayaan 1: ISRO's mission to Venus". Hindustan Times. 2023-09-29. Retrieved 2024-04-19.
- ""Venus mission already configured...": ISRO chairman Somanath". The Times of India. 2023-09-27. ISSN 0971-8257. Retrieved 2024-04-19.
- "ISRO SYNERGISES NATIONAL EFFORTS TO STUDY PLANET VENUS". www.isro.gov.in. Retrieved 2024-04-19.
- ^ "Chandrayaan-4: India's next moon mission which will be launched in 2 phases". The Times of India. ISSN 0971-8257. Retrieved 2024-04-19.
- ^ "Chandrayaan-4 will be launched in two phases, both LVM-3, PSLV to be used". India Today. 6 March 2024. Retrieved 2024-04-19.
- ^ "Chandrayaan-4 mission in 'process of developing', says ISRO chairman". The Economic Times. 2024-04-10. ISSN 0013-0389. Retrieved 2024-04-19.
- ^ "Moon Monday #183 and Indian Space Progress #17: The one where Chandrayaan and Gaganyaan converge". Jatan’s Space. 2024-07-08. Retrieved 2024-07-09.
- ^ "India's first space station unit is just 4 years ahead: ISRO chief S Somanath". www.onmanorama.com. Retrieved 2024-04-20.
- ^ "Space Assigned Numbers Authority (SANA)". sanaregistry.org. Retrieved 2024-04-20.
- ^ "Gaganyaan's First Test Abort Flight in May; Space Mission 'High Priority Activity', Lok Sabha Told". News18. 2023-03-16. Retrieved 2024-04-20.
- "Prime Minister reviews readiness of Gaganyaan Mission". pib.gov.in. Retrieved 2024-04-20.
- "Gaganyaan: ISRO to Launch First Full-Scale Unmanned Mission in February Next Year". The New Indian Express. 23 April 2023. Retrieved 8 May 2023.
- "India Launches Chandrayaan-2 Moon Mission". The New York Times. 22 July 2019. Retrieved 22 July 2019.
- ^ Indian Manned Spacecraft. Astronautix. 2014.
- ^ "Episode 90 – An update on ISRO's activities with S Somanath and R Umamaheshwaran". AstrotalkUK. October 24, 2019. Archived from the original on 2019-10-29. Retrieved October 30, 2019.
Spaceflight lists and timelines | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General | |||||||||||||||||
Human spaceflight |
| ||||||||||||||||
Solar System exploration | |||||||||||||||||
Earth-orbiting satellites | |||||||||||||||||
Vehicles | |||||||||||||||||
Launches by rocket type |
| ||||||||||||||||
Launches by spaceport | |||||||||||||||||
Agencies, companies and facilities | |||||||||||||||||
Other mission lists and timelines |