Suseo Station 수서역 | |
---|---|
Station building | |
General information | |
Location | Gangnam, Seoul South Korea |
Operated by | SR Corporation Korail Seoul Metro GTX-A Line Co., Ltd. SG Rail Co., Ltd. |
Construction | |
Structure type | At-grade and underground (SRT and Subway) |
History | |
Opened | October 30, 1993 (1993-10-30) (Seoul Metro) September 1, 1994 (1994-09-01) (Korail) December 9, 2016 (2016-12-09) (SRT) March 30, 2024 (2024-03-30) (GTX-A) |
Suseo Station (Korean: 수서역; Hanja: 水西驛; RR: Suseo-yeok) is a railroad station on the Suin–Bundang Line and Line 3 of the Seoul Metropolitan Subway. The station is in the Suseo neighborhood of the Gangnam District in Seoul, South Korea. Prior to the Line 3 extension to Ogeum station in 2010, Suseo Station was the southeastern terminus of Line 3. Along with Yangjae station, Suseo Station serves as an important transfer point between Line 3 and buses from/to southern cities such as Seongnam, Yongin, and Suwon.
In December 2016, it became the northern connection point to the Suseo–Pyeongtaek high-speed railway running SRT.
On 30 March 2024, Suseo Station became the northern terminus of the first phase of Line A of the GTX. From this station, the GTX travels south and shares tracks with the SRT on the right-of-way inside the Yulhyeon tunnel and Suseo–Pyeongtaek high-speed railway. The platforms of the GTX are separate from those of the SRT.
In the future, Bundang Line station plans to install evacuation lines on the platform as part of the express train operation. The Suseo Pyeongtaek Express Line is an underground section from this station to Dongtan station.
Services
SRT
Suseo station is the terminus of All SRT trains including:
- All trains that run Suseo–Pyeongtaek high-speed railway and directly to Daejeon, Daegu, and Busan by the Gyeongbu High-speed Railway
- All trains that run Suseo–Pyeongtaek high-speed railway and directly to Iksan, GwangjuSongjeong, and Mokpo by the Honam High-speed Railway
Seoul Subway
Seoul Subway serves the station with Line 3 and Suin–Bundang Line.
GTX
The GTX-A line linking Dongtan to Suseo opened on 30 March 2024. A connection north to Seoul Station and further to Paju City will open sometime in 2026.
Station layout
SRT platforms
Suseo 수서 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||
Location | Suseo-dong, Gangnam Seoul | ||||||||||||
Operated by | SR Corporation | ||||||||||||
Line(s) | |||||||||||||
Platforms | 3 | ||||||||||||
Tracks |
| ||||||||||||
Construction | |||||||||||||
Structure type | Ground | ||||||||||||
History | |||||||||||||
Opened | December 9, 2016 | ||||||||||||
| |||||||||||||
Terminus |
| 65 | | 43 | | 21 | |
Dongtan ↓ |
1·2 | for Busan · Dongdaegu · Mokpo · GwangjuSongjeong · Jinju · Masan · Yeosu EXPO · Pohang | |
---|---|---|
3·4 | ||
5·6 |
Seoul Metro platforms (Line 3)
| |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line 3 platform | |||||||||||||
General information | |||||||||||||
Location | Suseo-dong, Gangnam Seoul | ||||||||||||
Operated by | Seoul Metro | ||||||||||||
Line(s) | Line 3 | ||||||||||||
Platforms |
| ||||||||||||
Tracks |
| ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Accessible | Yes | ||||||||||||
History | |||||||||||||
Opened | October 30, 1993 | ||||||||||||
Electrified | Yes | ||||||||||||
| |||||||||||||
Irwon ↑ |
2 | | 13 | |
↓ Garak Market |
1 | Line 3 | for Express Bus Terminal · Jongno 3(sam)-ga · Gupabal · Daehwa |
---|---|---|
2 | for National Police Hospital · Ogeum or Alighting Passengers Only | |
3 | Line 3 | for Express Bus Terminal · Jongno 3-ga · Gupabal · Daehwa |
Korail platforms (Suin–Bundang Line)
| |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Suin–Bundang Line platform | |||||||||||||
General information | |||||||||||||
Location | Suseo-dong, Gangnam Seoul | ||||||||||||
Operated by | Korail | ||||||||||||
Line(s) | Suin–Bundang Line | ||||||||||||
Platforms |
| ||||||||||||
Tracks |
| ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Accessible | Yes | ||||||||||||
History | |||||||||||||
Opened | September 1, 1994 | ||||||||||||
Electrified | Yes | ||||||||||||
| |||||||||||||
↑ Daemosan |
2 | | 1 |
Bokjeong ↓ |
1 | Suin–Bundang Line | for Moran · Yatap · Seohyeon · Suwon · Incheon |
---|---|---|
2 | for Guryong · Seonjeongneung · Wangsimni · Cheongnyangni |
GTX-A
| |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
GTX-A platform | |||||||||||||
General information | |||||||||||||
Location | Suseo-dong, Gangnam Seoul | ||||||||||||
Operated by | GTX-A Line Co., Ltd. | ||||||||||||
Line(s) | GTX-A | ||||||||||||
Platforms |
| ||||||||||||
Tracks |
| ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Accessible | Yes | ||||||||||||
History | |||||||||||||
Opened | March 30, 2024 | ||||||||||||
Electrified | Yes | ||||||||||||
| |||||||||||||
The GTX platforms are located separately from the SRT platforms.
↑ Terminus |
2 | | 1 |
Seongnam ↓ |
1 | GTX-A | for Guseong · Dongtan |
---|---|---|
2 | Terminus |
Gallery
Exits
Exit No. | Image | Destinations |
---|---|---|
1 | Sindonga APT | |
1-1 | Daejin Design High School | |
2 | Samik APT | |
3 | Sejong High School, Suseo Elementary & Middle Schools | |
4 | Suseo E-Mart | |
5 | Daegok Elementary School, Mido APT | |
6 | Gungmaeul |
References
- "SRT to start operation next month". The Korea Times. 2016-11-02. Retrieved 2016-11-03.
- "First section of Seoul's GTX Line A opens". Railway Gazette International. 2 April 2024. Retrieved 2025-01-03.
- Jo, Gye-wan (2024-03-29). "[Q&A] GTX-A 30일 첫 운행…K-패스 O, 기후동행카드 X". The Hankyoreh (in Korean). Retrieved 2024-06-13.
External links
- (in Korean) Station information from Korail
- (in Korean) Station information from SR Corporation
SRT lines and services | ||||||
---|---|---|---|---|---|---|
Infrastructure |
| |||||
SRT services |
|
This Seoul Metropolitan Subway station article is a stub. You can help Misplaced Pages by expanding it. |