Misplaced Pages

Tai Lam Tunnel

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Tunnel in New Territories, Hong Kong Not to be confused with Tai Lam Tunnel on the Tuen Ma line.
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
This article contains wording that promotes the subject in a subjective manner without imparting real information. Please remove or replace such wording and instead of making proclamations about a subject's importance, use facts and attribution to demonstrate that importance. (March 2012) (Learn how and when to remove this message)
This article contains promotional content. Please help improve it by removing promotional language and inappropriate external links, and by adding encyclopedic text written from a neutral point of view. (March 2012) (Learn how and when to remove this message)
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Tai Lam Tunnel" – news · newspapers · books · scholar · JSTOR (September 2012) (Learn how and when to remove this message)
(Learn how and when to remove this message)
Tai Lam Tunnel
Entrance of Tai Lam Tunnel
Overview
Coordinates22°23′42″N 114°03′39″E / 22.394999°N 114.060831°E / 22.394999; 114.060831
StatusActive
SystemPart of Route 3
StartTing Kau
EndPat Heung
Operation
Opened25 May 1998; 26 years ago (1998-05-25)
OwnerHong Kong Government
OperatorRoute 3 (CPS) Company
TrafficVehicular
Vehicles per day140,000
Technical
Length3.8 km (2.4 mi)
No. of lanes6 lanes (3 lanes per direction)
Operating speed70 km/h (45 mph)

Tai Lam Tunnel (Chinese: 大欖隧道), is a tunnel in Hong Kong that forms part of the Tsing Long Highway of Route 3. It links Pat Heung and Ting Kau in the western New Territories.

The tunnel was constructed to ease traffic congestion on the Tuen Mun Road, Tate's Cairn Tunnel, and Castle Peak Road. It was also constructed to link traffic directly from New Territories West to urban areas of Kowloon West and Hong Kong Island, as well as Hong Kong International Airport and the Kwai Tsing Container Terminals.

Toll area

The Tai Lam Tunnel is a 3.8 km (2.4 mi) dual 3-lane tunnel. The total length of the R3CPS (the tolled area) is 10.1 km (6.3 mi).

The tolled area, with two entrances/exits at the south end, Ting Kau Bridge and Tuen Mun Road at Ting Kau, crosses Tai Lam Country Park to its north end at Pat Heung.

Located at Pat Heung and about 1 km (0.62 mi) from the north tunnel portal, the toll plaza consists of 22 tollbooths, 16 of which are for manual tolls and 6 are Autotoll lanes.

Construction and operation

Tai Lam Tunnel is a Build-Operate-Transfer (B.O.T) project with a franchise period of 30 years (including construction period). Its total construction cost was HK$7.25 billion.Construction on the tunnel started on 13 March 1995 and was officially opened to traffic on 25 May 1998 to match with the opening of the new Hong Kong International Airport.

The designed traffic capacity of Tai Lam Tunnel is 140,000 vehicles per day. In 2011/2012, the average daily traffic was over 54,000 vehicles.

According to the statistics from the Transport Department of the Government of Hong Kong, Tai Lam Tunnel has higher-than-average safety records. In 2011, the accident rate per million vehicle km was just 0.07.

Tunnel tolls

The tunnel is well known for its high tolls, similar to the Western Harbour Crossing. The toll for private cars is HK$55, making it the second most expensive tunnel in Hong Kong; the most expensive being the Western Harbour Crossing at HK$60. For coaches, it is the highest in the city, about 4 times higher than the longer Tate's Cairn Tunnel.

Category Vehicle Standard toll (HK$) Concessionary toll (current)
1 Motorcycle 60 22
2 Private car 65 48
Taxi
3 Private light bus 180 100
4 Light goods vehicle (less than 5.5 tonnes) 180 49
5 Medium goods vehicle (5.5 to 24 tonnes) 190 55
6 Heavy goods vehicle (more than 24 tonnes) 210 60
7 Single-decker bus 180 143
8 Double-decker bus 195 168
Additional axle 70 Free

Environmental protection and sustainable measures

This section does not cite any sources. Please help improve this section by adding citations to reliable sources. Unsourced material may be challenged and removed. (November 2012) (Learn how and when to remove this message)

The tunnel company performed compensatory tree planting at a rate of three replacement saplings for each tree felled. In total, 250,000 trees, 150,000 shrubs, and 60,000 climbing plants were planted during the construction period.

As for the conservation of wildlife, there is a small tunnel constructed at the south portal of Tai Lam Tunnel, mainly for small wild animals in the area to commute in the valley freely, allowing them to maintain their habituation.

To keep pace with technology development, Tai Lam Tunnel has gradually replaced traditional light bulbs with light-emitting diodes (LEDs). The indicator lighting signals inside the tunnel tubes and at the toll plaza, as well as the lighting system in the administration building, have been replaced in order to reduce carbon emissions.

See also

References

  1. ^ Cap 474 s2 on "franchise period"
  2. "Monthly Traffic and Transport Digest July 2012 - Tunnel, Lantau Link and Vehicular Ferry Services Statistics: Tai Lam Tunnel" (PDF). Transport Department of the Government of Hong Kong. July 2012. Retrieved 24 September 2012.
  3. "Route 3 Country Park Section Toll Adjustment" (PDF). Route 3 (CPS) Company Limited. 24 December 2012. Retrieved 25 February 2015.
  4. "Road traffic accidents in tunnels by tunnel and severity 2011" (PDF). Transport Department of the Government of Hong Kong. Retrieved 24 September 2012.
  5. "Transport Department - Toll Rates of Road Tunnels and Lantau Link". www.td.gov.hk. Archived from the original on 2013-10-17.
  6. "Route 3 (CPS) Company Limited - Tolls and Other Fees". Route 3 (CPS) Company Limited. Archived from the original on 7 January 2013. Retrieved 24 September 2012.
  7. "Transport Department - Tunnels and Bridges". Transport Department of the Government of Hong Kong. Archived from the original on 11 January 2013. Retrieved 3 November 2012.

External links

Preceded by
Ting Kau Bridge
Hong Kong Route 3

Tai Lam Tunnel
Succeeded by
Tsing Long Highway
Major road tunnels in Hong Kong
On Hong Kong Island
Crossings of
Victoria Harbour
In Kowloon and New Kowloon
Between New Kowloon and
the New Territories
In the New Territories
α. ^ Entirely in the New Territories, but all access roads on one side pass through New Kowloon.
Italics indicate that a tunnel is under construction.
Hong Kong Strategic Route and Exit Number System
Route 3
Categories: