Misplaced Pages

Zhulebino (Moscow Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Moscow Metro station
Zhulebino
Жулебино
Moscow Metro station
Station platform in 2016
General information
LocationVykhino-Zhulebino District
South-Eastern Administrative Okrug
Moscow
Russia
Coordinates55°41′08″N 37°51′23″E / 55.6855°N 37.8563°E / 55.6855; 37.8563
Owned byMoskovsky Metropoliten
Line(s)#7 Tagansko-Krasnopresnenskaya line Tagansko-Krasnopresnenskaya line
Platforms1 island platform
Tracks2
Construction
Structure typeShallow column two-span
Depth15 metres (49 ft)
Platform levels1
ParkingNo
AccessibleYes
History
Opened9 November 2013; 11 years ago (2013-11-09)
Services
Preceding station Moscow Metro Following station
Lermontovsky Prospekttowards Planernaya Tagansko-Krasnopresnenskaya line KotelnikiTerminus
Route map
Legend
Planernoye yard
Planernaya
Skhodnenskaya
Tushinskaya Out-of-station interchangeTransfer for #D2 Line D2 (Moscow Central Diameters) at Tushinskaya
Spartak
Moscow Canal
Shchukinskaya Out-of-station interchangeTransfer for #D2 Line D2 (Moscow Central Diameters) at Shchukinskaya
Oktyabrskoye Pole Out-of-station interchangeTransfer for #14 Moscow Central Circle at PanfilovskayaTransfer for #14 Moscow Central Circle at Zorge
Polezhayevskaya Transfer for #11 Bolshaya Koltsevaya line at KhoroshyovskayaTransfer for #11A Bolshaya Koltsevaya line at Khoroshyovskaya Out-of-station interchangeTransfer for #14 Moscow Central Circle at Khoroshyovo
Begovaya Transfer for #D1 Line D1 (Moscow Central Diameters) at Begovaya
to Krasnaya Presnya yard
Ulitsa 1905 Goda
Barrikadnaya Transfer for #5 Koltsevaya line at Krasnopresnenskaya
Pushkinskaya Transfer for #2 Zamoskvoretskaya line at Tverskaya Transfer for #9 Serpukhovsko-Timiryazevskaya line at Chekhovskaya
Kuznetsky Most Transfer for #1 Sokolnicheskaya line at Lubyanka
Kitay-gorod Transfer for #6 Kaluzhsko-Rizhskaya line at Kitay-gorod via cross-platform interchange
connection to Line 5
Taganskaya Transfer for #5 Koltsevaya line at Taganskaya Transfer for #8 Kalininskaya line at Marksistskaya
Proletarskaya Transfer for #10 Lyublinsko-Dmitrovskaya line at Krestyanskaya Zastava
Volgogradsky Prospekt
 3502 
Shosseynaya Street
Tekstilshchiki Transfer for #D2 Line D2 (Moscow Central Diameters) at Tekstilshchiki Transfer for #11 Bolshaya Koltsevaya line at Tekstilshchiki
Kuzminki
Ryazansky Prospekt
Vykhino Parking Vykhino railway station
Vykhino yard
MKAD_Москва.svg
MKAD
Moscow Ring Road
connection to Line 15
Lermontovsky Prospekt Transfer for #15 Nekrasovskaya line at Kosino Kosino railway station
Zhulebino
Kotelniki
This diagram:
Location
Zhulebino is located in Moscow MetroZhulebinoZhulebinoLocation within Moscow Metro

Zhulebino (Russian: Жулебино) is a station on Moscow Metro's Tagansko-Krasnopresnenskaya Line. It is named after Zhulebino district and situated at the intersection of General Kuznetsov and Aircraft designer Mil streets. Zhulebino was opened on 9 November 2013. The construction lasted for two years. The station was to be opened on 6 November 2013, however due to a technical failure of a train at neighbouring Lermontovsky Prospekt station it was delayed until the 9th. Its location is outside the Moscow Ring Road beltway.

The station is located underground although the track from Vykhino is at the surface for a part of the path.

The territory at which the station currently located was until 1984 a part of the town of Lyubertsy of Moscow Oblast. In 1984 it was transferred to Moscow, and subsequently rapid urban development started. The whole area, along with Lyubertsy and other areas along the Kazansky and Ryazansky suburban directions of Moscow Railway were strongly dependent on the station of Vykhino, then the terminus of the Tagansko-Krasnopresnenskaya Line and a transfer station to both railway directions. In the 2000s, Vykhino was heavily overloaded. Eventually, the decision was taken to extend the Tagansko-Krasnopresnenskaya Line beyond Vykhino. The construction of the first stretch, with the stations of Lermontovsky Prospekt and Zhulebino, started in August 2011. The tunnels were completed by September 2013.

Zhulebino was the terminus until 21 September 2015, when the new terminus at Kotelniki was opened.

References

  1. Указ Президиума ВС РСФСР от 19.03.1984 о передаче некоторых населённых пунктов Московской Области в административное подчинение Московскому городскому совету народных депутатов (in Russian). LawRussia.ru. Retrieved 9 November 2013.
  2. Участок "Выхино" — "Лермонтовский проспект" в Москве (in Russian). СК МОСТ. Retrieved 9 November 2013.

External links

Moscow Metro
#1 Sokolnicheskaya line Sokolnicheskaya line
#2 Zamoskvoretskaya line Zamoskvoretskaya line
#3 Arbatsko-Pokrovskaya line Arbatsko-Pokrovskaya line
#4 Filyovskaya line Filyovskaya line
Main
#4А 4А line Branch
#5 Koltsevaya line Koltsevaya line
#6 Kaluzhsko-Rizhskaya line Kaluzhsko-Rizhskaya line
#7 Tagansko-Krasnopresnenskaya line Tagansko-Krasnopresnenskaya line
Kalininsko-Solntsevskaya line
#8 Kalininskaya line Kalininskaya line
#8A Solntsevskaya line Solntsevskaya line
#9 Serpukhovsko-Timiryazevskaya line Serpukhovsko-Timiryazevskaya line
#10 Lyublinsko-Dmitrovskaya line Lyublinsko-Dmitrovskaya line
#11 Bolshaya Koltsevaya line Bolshaya Koltsevaya line
#12 Butovskaya line Butovskaya line
#13 Moscow Monorail Moscow Monorail
#14 Moscow Central Circle Moscow Central Circle
#15 Nekrasovskaya line Nekrasovskaya line
#16 Troitskaya line Troitskaya line
#17 Rublyovo-Arkhangelskaya line Rublyovo-Arkhangelskaya line
#18 Biryulyovskaya line Biryulyovskaya line
Categories: